AIC’s multi-discipline project skills, with the ability to secure financial closure, offers our many clients-National, Regional and International-the most comprehensive of service.

AIC’s rapid growth in the last few years has been an expansion into international markets throughout Africa and the Caribbean.
"
 
 
 

 

Experience Summary...

BAUCHI STATE
1977-1978
Ministry of Agriculture and Natural Resources
Feasibility Studies and investigation of the irrigation and agricultural Potential of four area :Bagel-Zungur, Katini , Balanga and Kaltungo totaling 47,000 hectares. Proposed development incorporated four dam structure and up to 22,000 hectares of agricultural development.


SOKOTO STATE
1977-1979
Federal Ministry Government of Nigeria
Birnin Kebbi Army Barracks. Construction Management and site inspection services for Am cord (Nigeria) Ltd turnkey contractors for $32 million system built army cantonment: including all utilities and services

OYO STATE
1978
Ministry of Agriculture and Natural Resources
Feasibility studies for irrigated agriculture and fish farming scheme near existing villages’ .Agricultural projects up to 1,000 hectares in area agronomy, Hydrological economic and engineering aspects. Fisheries development included selection of suitable species, locations and economic analyses.


BAGEL-ZUNGUR IRRIGATION PROJECT
1979-1980
Upper Benue River Basin Development Authority

Reconnaissance soil survey of extended irrigable areas followed by full feasibility study comprising 34,400 hectares. Analysis of Agronomy, irrigation, livestock development, diary industries, agro-industries, rural water supplies, resettlement villages: engineering design of dams, irrigation systems and drainage networks.
Cost 70million pounds.


NIGERIA
1976-1979
Contractors All Risk (CAR) insurance
Expert advice, failure studies, project and risk appraisal for the Nigerian insurance and re-insurance market .Projects included:

  • Federal secretariat, Ikoyi
  • Third mainland Bridge Lagos
  • South Chad irrigation scheme
  • Agbara brewery, Lagos
  • Kwal-Oleh junction and Auchi-Ibilo Roads

BACITA
1976-1977
Nigerian sugar Co Ltd via SATEC
Technical assistance to consulting engineers engaged on soil and engineering surveys, feasibility study and project proposals to extend existing irrigated sugar estate at Bacita by a further 800 hectares: included flood protection, drainage and pumping station .Subsequent detailed design and construction management.
Cost 4milliion pound

BORNO & GONGOLA STATES
1978
 UTC Engineering
Civil engineering design of a 35000Kva diesel power station incorporating office, stores etc., and a 6 tonne OET crane, for use in five different locations on rural electrification projects.

PLATEAU STATE
for 2 decades
Nigerian Electricity Supply Corporation
Annual Inspection of dams and head works for hydro-electric scheme at Tenti, Ankwill 1 &2 ,kurra intake ,Jekko 1 & 2,Ouree,kwall Stream and Gwill.
Design of transmission Tower Foundations. Feasibility study for Sha falls hydro-electric scheme.

IWOPIN
1976-1978
The Nigerian national Paper Manufacturing Co Ltd
Our associate company, Intec, were employed as sub-consultants to Stohert Management to engineer the steam and power areas of a 100,000 tonnes /year bleached  Kraft pulp and paper mill at Iwopin.
Capital cost 100 million pounds

OGUN STATE
1980-1984
Ogun-Osun River Basin Development Authority.
AIC limited working with Wimpey construction of the UK was responsible for the hydro-electric power installation and construction of Oyan dam .The dam releases c.200 million gallons of raw water per day for domestic and industrial use to the Ogun and Lagos  state water corporations. In addition the reservoir will provide water for both irrigation and fish farming.
Cost 40 million pounds

PLATEAU STATE
1980

Studies for water supplies to eleven semi-urban townships including identifying possible water sources, geophysical, topographical, geological and preliminary hydrological surveys. Development of outline designs for each township with projected populations of 4,000

BAUCHI STATE
1982-1985
Ministry of Agriculture  and Natural resources
Balanga Dam and irrigation scheme.
Detaileddesign and technical supervision of construction of the scheme comprising dam, conveyance canals, control structures and drainage system .Irrigation area 4,000 hectres, comprising both gravity and sprinkler systems
Cost 33million pounds

KANO STATE
1978
Hadeija –Jama’are River Basin Development Authority.

Safety inspection and report on Tiga Dam

 

 

 

OYO STATE
1980-1984
Oyo State Water Corporation
AIC Limited working with PCI and Jos –Hansen was involved in the installation of treatment plant and pumping equipment for the Oshogbo-Ede water Supply Scheme which at the time was one of the biggest water supply projects in the African sub-region at 35 mgd capacity.

ONITSHA
1983-1985
National Electric Power Authority
Feasibility studies and investigation for a Lignite and Natural gas fired power station comprising 4P350MW steam turbine generators and boilers. The station was to be located adjacent to the River Niger which would provide direct cooling water.
Cost 500 million pounds


BAUCHI

1984
Bauchi State Urban Development Board
A turnkey project for the construction of four modern markets in four major town of Bauchi state. The area covered by the market range from 4 to 11 hectares the market included 6044 stails,4 mosques,4 transformer stations,4 to 11 hectares the market included 6044 stails , 4 mosques,4 transformer stations,4 fire and pump stations, 8 workshops ,9 warehouse and other ancillary buildings. The firm was responsible for surveys analysis of subcontractor bids project management and resident site supervisors.

BAUCHI STATE
1984-1985
Ministry of Agriculture and Natural resources

Feasibility studies and investigation of the irrigation and agricultural potential of the project area with respect to Lake Diya and Lake Malandumba as sources of water supply for the irrigation are of 500 hectares.

BAUCHI STATE
1988
Bauchi State Urban Utilities Board
Water supply project to Bauchi town.
The scheme is to supply 10 million gallons of water per day to the state capital. The scheme is funded by ADB in the sum of
$70million.

PLATEAU STATE
1991
Plateau Public Utilities Board
Keffi/Akanga Doma water supply scheme and Jos /Bukuru expansion project .Feasibility study and implementation. Construction of water scheme for Keffi/Akwanga from Madi River intake and for Doma town from the Doma reservoir.The capacity of the existing Yakubu Gowon Treatment works is doubled to 20 mgd at Bukuru to serve the Jos/Bukuru metropolis.
Capital cost: $165million

IMO STATE
1992
Ministry of Works and Transport
Preparation of feasibility report, surveys, engineering designs and tender documentation for water supply schemes to 16 local govt., areas.

SOKOTO STATE
1991-1992
Sokoto-Rima River Basin Development
Preparation of feasibility study for the development of a viable and sustainable irrigation agricultural project in the middle Rima Valley are of sokoto state .Ten scheme are proposed downstream of Goronyo Dam, gravity and pump fed.

BENDEL STATE
1989
Bendel State Public Utilities Board
Water Supply scheme at Benin city and Warri/Effurun to supply 35million gallons water per day .Project funded by African development bank in the sum of $120 million .also phase 1 of Northern Ishan water supply scheme to supply 10million gallons of water per day at cost of N150 million.

LAGOS
1991-
Federal Ministry of Information and Culture
Complete rehabilitation and refurbishment of the structure, fabrics and services of the national theatre building and external works with renovation of services of the National Art Theatre.  Fundamental structural building and external work with renovation of services comprising air-conditioning, telephony and electronic equipment.
Replacement value $200 million.

LAGOS STATE
1992
Federal Fisheries Department
Economic Feasibility Report and Tender Design for Lagos Fisheries Terminal. Facility provides for Ocean going reefers to discharge cargo in 20kg cartons with cold storage, fueling and repair facilities.
Capital Cost:$80million.

PLATEAU STATE
1993
Health care Delivery in Plateau State
Architectural, Engineering and Supervision services for hospitals and Hospital Equipment.Preparation of tender documents for the ADB’s ICB procedures.

ADAMAWA STATE
1993
Adamawa State Water Board
Yola/Jimeta Water Supply scheme .A Feasibility Review and Preliminary Design report for an 81,825 cu.m/day supply scheme from the Benue River.
Capital cost: $75million

BAUCHI STATE
1993
Bauchi state water Board
Feasibility study for Gombe Water Supply Scheme. The scheme for Gombe Township (and other Village) utilizes the Dadin Kowa dam on the Gongola River. 70,000 cu.m/day supply capacity.
Capital Cost: $100 million

KWARA STATE
1993
Kwara State Water corporation
Feasibility Study, Environmental impact assessment and tender design for the Ilorin & Jebba water supply scheme, 128,000 cu.m/day work for Ilorin and 12,500 cu.m/day at Jebba.
Capital cost: $140 million.

AKWA IBOM
1992
Akwa Ibom state water corporation
feasibility study and Design report for expansion of water supply to Uyo Metropolis based on rehabilitation of an existing scheme supplemented with additional borehole sources to provide 130,000 cu.m/day capacity

KEFIN ZAKI
1993
Federal Ministry of Agriculture, Water Resources and Rural Development
Study to Formulate A Programme For The Development Of The Kafin Zaki Project.

OYO & KWARA STATE
1994-
Federal Ministry Of Works and Housing
Reconstruction of the Ibadan –Ilorin Highway; afour lane divided asphaltic concrete road of 136km between Ibadan and Ilorin. Finance by the African Development Bank.
Capital cost: $ 200million

     
 
 